well its been a while i must admit, been building an IS200 race car so this and that and other paying jobs mean this has been a little on the sideline, for the builders
The car now runs, the electrics need tidying up somewhat....
They found that it was a nightmare trying to find someone to mandrel bend 100mm pipework, which posed a small problem for the rear section of the car, so the only option was to go with 76mm pipes for the rear section and double up the box's, so Twin HKS hiper's have now been fitted, and the two sectiuons plumbed together.
so now i have 100mm front to rear with 76mm going from the split to each Hiper
once the rear skirt was cut the rear system was mounted
and a side angle

[/img]